Contents
iv
Cisco CRS-1 Carrier Routing System Multishelf System Upgrade and Conversion Guide
OL-12571-01
Converting to an Integrated Switch System 2-1
Contents 2-1
Prerequisites for the Integrated Switch System 2-2
Cisco CRS-1 Multishelf Conversion to an Integrated Switch System Introduction 2-2
Cisco CRS-1 Multishelf Integrated Switch Sol ution 2-3
Benefits of the CiscoCRS-1 Multishelf Integrated Switch Solution 2-3
Naming Conventions 2-3
How to Convert from the Cisco Ca talyst 65xx Switch to the Integrated Swi tch System for Single-FCC
Multishelf and Two-FCC Multishelf Systems 2-4
Validating the 22-port SCGE Cards (Single-F CC Multishelf and Two-FCC Multishelf Systems) 2-4
Connecting the 22-port SCGE to an Active Cat6K (Single-FCC Multishelf and Two-FCC Multishelf
Systems) 2-5
Transferring the Backup Cisco Catalyst 65xx Switch Gigabit Ethernet Connections to a Standby
22-port SCGE (Single-FCC Multishelf a nd Two-FCC Multishelf Systems) 2-6
Performing a Failover to a Standby 22-port SCGE (Single-FCC Multishelf and Two-FCC Multishelf
Systems) 2-7
Connecting the 22-port SCGEs into a Full Mesh (Single-FCC Multishelf and Two-FCC Multishelf
Systems) 2-8
Transferring an Active Cat6K Gigabit Ethernet Connections to the Active 22-port SCGE (Single-FCC
Multishelf and Two-FCC Multishelf Systems) 2-9
How to Convert from the Cisco Ca talyst 65xx Switch to the Integrated Switc h System for a Four-FCC
Multishelf System 2-10
Validating the 22-port SCGE Cards (Four-FCC Multishelf System) 2-10
Connecting the 22-port SCGE to an Active Cat6K (Four-FCC Multishelf System) 2-10
Transferring the Backup Cisco Catalyst 65xx Switch Gigabit Ethernet Connections to a Standby
22-port SCGE (Four-FCC Multishelf System) 2-13
Performing a Failover to a Standby 22-port SCGE (Four-FCC Multishelf System) 2-14
Connecting the 22-port SCGEs into a Full Mesh Configuration (Four-FCC Multishelf System) 2-15
Transferring an Active Cat6K Gigabit Ethernet Connections to the Active 22-port SCGE (Four-FCC
Multishelf System) 2-16
Index