Citrix Systems 9.3 setup guide Preparing for Installation

Models: 9.3

1 110
Download 110 pages 43.49 Kb
Page 69
Image 69

Chapter 2

Preparing for Installation

Topics:

Unpacking the Appliance

Preparing the Site and Rack

Cautions and Warnings

Before you install your new appliance, carefully unpack your appliance and make sure that all parts were delivered. Once you are satisfied that your appliance has been delivered to your expectations, verify that the location where the appliance will be installed meets temperature and power requirements and that the server cabinet or floor-to-ceiling cabinet is securely bolted to the floor and has sufficient airflow.

Only trained and qualified personnel should install, maintain, or replace the appliance, and efforts should be taken to ensure that all cautions and warnings are followed.

69

Page 69
Image 69
Citrix Systems 9.3 setup guide Preparing for Installation