Cleveland Range 22CGT6, 22CGT3 Installation Check List, Task Reference Completed

Models: 22CGT6 22CGT3

1 27
Download 27 pages 7.11 Kb
Page 19
Image 19

L. Installation Check List

 

 

 

Table 2-4 Installation Check List

 

 

TASK

REFERENCE

COMPLETED

 

(Page Number)

 

 

Preparation

 

 

 

Check Operating Location Clearances

3-4

 

 

Test Supply Water Quality

7

 

 

Verify Electric Power Requirements.

9

 

 

Verify Gas Supply Requirements

6

 

 

Verify Exhaust Hood Requirements

4

 

 

Installation

 

 

 

Verify SteamChef is Level

5

 

 

Check Exhaust Hood Function

4

 

 

Check Electrical Supply Connection

9

 

 

Check Water Supply Connection

8

 

 

Leak Test Water Supply Lines

9

 

 

Check Gas Supply Connection

7

 

 

Leak Test Gas Supply Connection

7

 

 

Check Drain Line Connection

10

 

 

Notes:

13

Page 19
Image 19
Cleveland Range 22CGT6, 22CGT3 installation manual Installation Check List, Task Reference Completed