L. Installation Check List |
|
|
|
Table |
|
| |
TASK | REFERENCE | COMPLETED | |
| (Page Number) |
|
|
Preparation |
|
|
|
• Check Operating Location Clearances |
|
| |
• Test Supply Water Quality | 7 |
|
|
• Verify Electric Power Requirements. | 9 |
|
|
• Verify Gas Supply Requirements | 6 |
|
|
• Verify Exhaust Hood Requirements | 4 |
|
|
Installation |
|
|
|
• Verify SteamChef is Level | 5 |
|
|
• Check Exhaust Hood Function | 4 |
|
|
• Check Electrical Supply Connection | 9 |
|
|
• Check Water Supply Connection | 8 |
|
|
• Leak Test Water Supply Lines | 9 |
|
|
• Check Gas Supply Connection | 7 |
|
|
• Leak Test Gas Supply Connection | 7 |
|
|
• Check Drain Line Connection | 10 |
|
|
Notes:
13