
| 
 | Table of Contents | |
| 1 Introduction | 
 | |
| 1.1 | Overview | |
| 1.2 | Components and Controls | |
| 
 | 1.2.1 Front Components | |
| 
 | 1.2.2 Operator Control Panel | |
| 
 | 1.2.3 Internal Components | |
| 
 | 1.2.4 Rear Components | |
| 1.3 | Specifications | |
| 2 Installation | 
 | |
| 2.1 | General | |
| 2.2 | Site Preparation | |
| 2.3 | Unpacking the Shipment | |
| 2.4 Installing the  | ||
| 
 | 2.4.1 Determining the Installation Area | |
| 
 | 2.4.2 Attaching the Slide Assemblies to the Cabinet Rails | |
| 
 | 2.4.2.1 Attaching the Right Slide Assembly to the Cabinet Rails | |
| 
 | 2.4.2.2 Attaching the Left Slide Assembly to the Cabinet Rails | |
| 
 | 2.4.3 Attaching the Inner Races to the Tray | |
| 
 | 2.4.4 Mounting the Memory Channel Hub, Front Bezel, and Interlock Actuator | |
| 
 | Bracket on the Tray | |
| 
 | 2.4.5 Mounting the Chassis and Tray Assembly on the Slides | |
| 2.5 | Installing the Interlock System | |
iii
