a. Alignthe chipperchuteoverthe weldstuds,so the slotin the bottomof the chuteisfacingdown.SeeFigure6.
b. Securechipperchutewiththe threecuppedwashers(cupped side againstthechipperchute)and hexnutspreviously removed.Do nottightenthe nutsat thistime.
3, The chippershredderwasshippedwithoneendof the support bracealreadysecuredto the lowerframe.Loosenbutdo not removethe boltssecuringthe braceto the frame.
a. Alignthe holesin thechutewiththe holesinthe top of the braceandattachbraceto chipperchutewithhardware previouslyremoved.Tightensecurely.SeeFigure7.
b. Tightenthe boltssecuringthe supportbraceto the frame. c. Tightenthethree nutson the weldstudsholdingthe chipper
chuteto the impellerhousing.
ATTACHING THE BAG
1.Toattachthe bag:
a.Placethe openingof the bagcompletelyoverthe chute deflector.
b.Pullon thedrawstringuntilthe bagis tightaroundchute deflectoropening.
c.Clipdrawstringbackon itself,tightagainstchutedeflectorto secureintoposition.SeeFigure8.
Figure6
Figure7
Figure8
10