Power
Checkout Procedures
POST TESTING
After completion of testing, if all tests are satisfactory, the amplifier controls should be returned to the posi- tions required by customer. If conditions are unknown or unspecified, factory settings are as follows:
Level Controls: 9 to 11 O’Clock.
Sensitivity Switch: 0.775V U.S., 1.4V International.
Stereo/Mono Switch: Stereo.
Ground Lift: Lift.
Power: Off.
16