M600 installation instructions 12c CUTTING INNER PIPE OF HORIZONTAL TERMINAL
Models:
M600
1
17
22
22
Download
22 pages
62.75 Kb
14
15
16
17
18
19
20
21
<
>
Install
Dimension
8 CONCENTRIC VENT ADAPTER ASSEMBLY
Page 17
Image 17
FIGURE 1.12c: CUTTING INNER PIPE OF HORIZONTAL TERMINAL
FIGURE 1.12d: COMPLETING HORIZONTAL TERMINAL INSTALLATION
15
Page 16
Page 18
Page 17
Image 17
Page 16
Page 18
Contents
P.O. Box 14818 3633 I. Street Philadelphia, PA
Manufacturer of Hydronic Heating Products
BWC150/225 CONCENTRIC VENTING INSTALLATION INSTRUCTIONS
BWC Series
Page
B. Concentric Vent Adapter Kit Installation
Table of Contents
C. Assembly of Crown Concentric Venting and Condensate Drain
A. Concentric Vent System Design
Concentric Venting For BWC150 and BWC225
Do not install a barometric damper or drafthood on this boiler
A. Concentric Vent System Design
Do not attempt to mix components from different approved vent systems
Example
Do not install the vent terminal directly over windows or doors
45 Elbow Uncut Terminal Section
4 Permitted Terminals for Horizontal Venting
MINIMUM
TABLE 1.1 SUMMARY OF HORIZONTAL VENTING OPTIONS
6 Permitted Terminals for Vertical Venting
FIGURE 1.2 HORIZONTAL CONCENTRIC VENTING VENT OPTION 3,4
FIGURE 1.3c POSITIONING VENT TERMINAL UNDER OVERHANGS
VENT
TABLE 1.4 VENT/ AIR INTAKE FITTING EQUIVALENT LENGTH
TABLE 1.5 SUMMARY OF VERTICAL VENTING OPTIONS
TABLE 1.6b CROWN CONCENTRIC100/150 VENT COMPONENTS VENT OPTIONS 8,9
TABLE 1.6a CROWN CONCENTRIC 80/125 VENT COMPONENTS VENT OPTIONS 3,8
FIGURE 1.7 VERTICAL CONCENTRIC VENT SYSTEM VENT OPTION
B. Concentric Vent Adapter Kit Installation
1 The Concentric Vent Adapter Kits include
Description
j Use the exposed holes to line up the air intake box and gasket
FIGURE 1.8 CONCENTRIC VENT ADAPTER ASSEMBLY
h Replace and tighten the clamp on the vent collar
80/125
C. Assembly of Crown Concentric Venting
100/150
230517
b Remove the plastic inner pipe by pulling it out from the female end
f Reinstall the inner pipe 3 Joining Pipe
d Make an insertion mark 1” from the male end of the outer pipe
FIGURE 1.10 CUTTING STRAIGHT PIPE
FIGURE 1.11b JOINING NON CUTTABLE PIPE
4 Horizontal Terminal Installation FIGURE 1.11a JOINING CUTTABLE PIPE
FIGURE 1.12b CUTTING OUTER PIPE OF HORIZONTAL TERMINAL
FIGURE 1.12a DIMENSION “L”, HORIZONTAL TERMINAL
FIGURE 1.12c CUTTING INNER PIPE OF HORIZONTAL TERMINAL
FIGURE 1.12d COMPLETING HORIZONTAL TERMINAL INSTALLATION
FIGURE 1.13a DIMENSION “H”
FIGURE 1.13b CUTTING VERTICAL TERMINAL
FIGURE 1.13c COMPLETING VERTICAL TERMINAL INSTALLATION
VERTICAL TERMINAL FLAT ROOF FLASHING WEATHER TIGHT FLAT ROOF
FIGURE 1.14 CHIMNEY CHASE INSTALLATION
OVER ORIGINAL OPENING UNUSED CHIMNEY SUPPORT ELBOW FROM BO ILER
CHIMNEY CHASE BRACKET INCLUDED WITH SUPPORT ELBOW MID X MACHINE SCREW
FIGURE 1.15 CONDENSATE DRAIN LINE ASSEMBLY
PN 980241 Rev BWC - 12/07