Danby DKC146SLDB INSTALLATION OF CO2 AIR LINE HOSE TO REGULATOR, Installation Of The Beer Tower

Models: DKC146SLDB

1 45
Download 45 pages 1.74 Kb
Page 10
Image 10
INSTALLATION OF CO2 AIR LINE HOSE TO REGULATOR

INSTALLATION OF THE BEER TOWERBeer Keg Installation Instructions

INSTALLATION OF CO2 AIR LINE HOSE TO REGULATOR

INSTALLATION OF THE BEER TOWER

Attach the open end of the red hose to the hose barb connection on the regulator

Secure hose by using one clamp provided. Use pliers/screwdriver to tighten clamp to prevent leaks. (See Figure 3)

Remove the top plug by twisting and pulling out, saving it for later use if you decide to convert unit to an all refrigerator unit.

Unravel the beer line (clear hose) from the tower and insert the beer line and wing nut through the uncovered hole on top.

Lock the beer tower assembly to the top and make sure to position the beer faucet so it is aligned with the cabinet front (6 o’clock position). You accomplish this by aligning the bottom of the beer tower to the 3 grooves on the top cabinet and tighten by hand clockwise to properly lock.

The plastic gasket (# 2 in parts list), can be used to make the connection between the tower and the cooler tighter if needed. If Beer Tower will not turn to lock in place, try removing the plastic gasket.

INSTALLATION OF PROTECTIVE METAL PLATE

INSTALLATION OF THE BEER KEG

This plate should always be installed when the keg is in place to protect against unnecessary damage to the floor of the cabinet.

Position the beer keg directly in front of the open door. Using keg handles only, carefully lift the beer keg. (See Figure 5)

To place the beer keg inside the cabinet, brace your knees behind the beer keg. Lift the front of the keg just enough so the front edge of the keg is resting on the front edge of the Beer Dispenser bottom cabinet.

(See Figure 6)

Grasp the keg handles and slide it all the way into the cabinet.

Figure 4

INSTALLATION OF THE KEG COUPLER

Figure 5

Figure 6

Insert the keg coupler provided into the locking neck of the beer keg and turn it clockwise to lock into position, making sure the keg coupler is in the closed position. (See Figure 7)

9

Page 10
Image 10
Danby DKC146SLDB manual INSTALLATION OF CO2 AIR LINE HOSE TO REGULATOR, Installation Of The Beer Tower, See Figure