DCS 221712 manual Integral Ventilator Installation

Models: 221712

1 48
Download 48 pages 47.55 Kb
Page 13
Image 13
INTEGRAL VENTILATOR INSTALLATION

INSTALLATION

9.Ducting: There should be no more than 1" gap between canopy transition and house ducting. Adjust starting collar over both ducts. Tighten collar. Fasten duct with screws and tape per code. Screws must not hamper the damper. See Fig. 9.

INTEGRAL VENTILATOR INSTALLATION

(see Fig. 10 to 11)

1.The Integral ventilator can be mounted to discharge air towards the ceiling. So motor connector may be located frontwards.

From the inside of the hood, slip motor into the bracket on the left.

Rotate motor upwards until it snaps into the spring clip on the right.

Secure the motor to the hood with the machine screw and lock washer.

Plug connector into the motor, Fig. 11.

From Control

Panel

Motor connector

FIG. 11

10" Duct

Manual backgroundManual background Collar

Transition

FIG. 9

 

 

Outlet

 

Bracket

Spring Clip

 

 

 

Integral ventilator for 40" Hood

Bracket

 

Motor Connector

 

 

Fixing

Fixing

point

point

Motor Manual background

support

Spring Clip

FIG. 10

11

Page 13
Image 13
DCS 221712 manual Integral Ventilator Installation