Dell 1500, PowerApp 120 manual Attaching the Brackets, Securing the System in the Rack

Models: PowerApp 120 1500

1 80
Download 80 pages 61.74 Kb
Page 12
Image 12

Attaching the Brackets

1.Measure the rack to determine if the two-post relay rack is 3 inches wide or

6 inches wide. The rearmost bracket on each side can be positioned for either 3- or 6-inch wide racks.

2.Align a bracket on the right side of the chassis, oriented so that the flange that fastens to the two-post rack is facing backward. The two top mounting holes must be aligned with the fourth and fifth holes on the side of the system chassis (see Figure 1-3).

3.Secure the front bracket to the system chassis using two 10-32 x 0.25-inch screws (see Figure 1-3).

Repeat this step to install the remaining front bracket to the other side of the system chassis.

holes for 3-inch wide rack

fifth hole from front

fourth hole

from front

12-24 x 0.5-inch pan-head Phillips screws (2 per bracket)

hole for 6-inch wide rack (only front hole is used)

10-32 x 0.25-inch pan-head Phillips screws (For 3-inch wide rack: 2 per bracket. For 6-inch wide rack: 2 per front bracket, 1 per back bracket)

Figure 1-3. Securing the System in the Rack

1-4 Rack Installation Guide

Page 12
Image 12
Dell 1500, PowerApp 120 manual Attaching the Brackets, Securing the System in the Rack