Installing the Dell UPS into the rack:
Install the ReadyRails followed by the UPS chassis. Finally install the battery modules into the UPS chassis & connect the DC leads. Finish by installing the UPS front panel.
Install the optional external battery module (EBM), Network Management Card (NMC), Environmental Monitoring Probe (EMP) and PDU(s)2, if ordered.
Note: The Dell UPS equipment is heavy. Refer to the user guide for complete guidance on safety. Some key points are:
∙You should typically place the UPS at the bottom of the rack for a lower centre of gravity
∙Extend the rack stabilization feed during installation to prevent the rack tipping
∙Ensure you follow health & safety recommendations for working with heavy & electrical equipment
2Dell 16 Amp and 32 Amp PDUs can be plugged into Dell UPS. Dell 10kW UPS model with 2 x 32A outlets is tested with Dell 32 Amp PDU types for fit.