Prerequisites for Rack Server, S5000, and Compellent

The following table describes the prerequisites for the FCoE solution offered using Rack Server, S5000, and Compellent. For more information, see http://en.community.dell.com/techcenter/extras/m/ white_papers/20387203

Resource

Prerequisites

 

 

S5000

• DCB needs to be enabled.

 

• VLT needs to be disabled.

 

• Enable Fibre Channel capability and Full Fabric

 

 

mode.

 

 

feature fc

 

 

fc switch-mode fabric-services

 

• Enable FC ports connecting to Compellent

 

 

storage array and FC ports connecting to other

 

 

S5000 switch via ISL links.

 

 

interface range fi 0/0 - 7

 

 

no shut

 

Create DCB Map.

 

 

dcb-map SAN_DCB_MAP

 

 

priority-group 0 bandwidth 60 pfc

 

 

off

 

 

priority-group 1 bandwidth 40 pfc

 

 

on

 

 

priority-pgid 0 0 0 1 0 0 0 0

 

 

exit

 

• Create a FCoE VLAN.

 

 

interface vlan <VLAN ID> [Create

 

 

VLAN for FCoE]

 

 

exit

 

Create FCoE Map.

 

 

fcoe-map default_full_fabric

 

 

fabric-id <FCoE VLAN ID> vlan <FCoE

 

 

VLAN Id>

 

 

fc-map <FC MAP>

 

 

exit

Compellent

Fault domain need to be created as per

 

Compellent best practices.

Prerequisites for M1000e (with MXL), S5000, Brocade, and Compellent

The following table describes the prerequisites for the FCoE solution offered using M1000e (with MXL), S5000, Brocade, and Compellent. For more information, see http://en.community.dell.com/techcenter/ extras/m/white_papers/20387203

13

Page 13
Image 13
Dell 8 manual Prerequisites for Rack Server, S5000, and Compellent