Figure 9. Power Cables

3.Secure each power cable to the storage system chassis using the strain relief fasteners.

4.Plug the other end of the power cables into a grounded electrical outlet or a separate power source such as an uninterrupted power supply (UPS) or a power distribution unit (PDU).

CAUTION: Be careful when closing the rear rack door to ensure that power cords have adequate space as some racks might not be sufficiently deep.

Turning on the Storage System

Turn on the storage system after racking and cabling all of the Storage Center components. Turn on the Storage Center system components in the following order:

1.Turn on the network switches (if installed).

2.Turn on the expansion enclosure (if installed).

NOTE: Before turning on the storage system, make sure that the status indicator on the front of the expansion enclosure is green.

3.Turn on the storage system by pressing both power switches at the same time.

Figure 10. Location of the SCv2080 Storage System Power Switches

18

Page 18
Image 18
Dell SCv2080 manual Turning on the Storage System, Power Cables