Manuals
/
DeLonghi
/
Kitchen Appliance
/
Double Oven
DeLonghi
DEBIGE 2440 SS, DEBIGE 2440 W, DEBIGE 2440 E warranty
Models:
DEBIGE 2440 E
DEBIGE 2440 SS
DEBIGE 2440 W
1
34
36
36
Download
36 pages
16.34 Kb
29
30
31
32
33
34
35
36
<
>
Specs
Install
Electric diagram key
Maintenance
Door Assembly
electronic clock/end cooking timer
Adjustment Of The Oven Burner Minimum
Setting The Pressure Regulator
TEMPERATURE SELECTOR KNOB fig
How to
Page 34
Image 34
34
Page 33
Page 35
Page 34
Image 34
Page 33
Page 35
Contents
BUILT-INDUAL FUEL DOUBLE OVEN
IMPORTANT - PLEASE READ AND FOLLOW
INSTALLATION ADVICE
Models DEBIGE 2440 SS DEBIGE 2440 E
WHAT TO DO IF YOU SMELL GAS
Page
USER INSTRUCTIONS
KEEP ATTENTION
Never touch the appliance with wet hands or feet
control panels
Both the ovens can be used
contact the After-SalesService
Only the upper electric oven can be used
Disconnect the oven from the gas mains and
SETTING THE FREQUENCY OF THE ALARM SOUND
electronic clock/end cooking timer
ELECTRONIC ALARM
ELECTRONIC CLOCK fig
USING THE OVEN FOR THE FIRST TIME
how to use the lower gas oven
GENERAL FEATURES
OVEN BURNER
IGNITION OF THE OVEN BURNER
OVEN COOKING
IGNITION OF THE BROIL BURNER
OVEN LIGHT
3 STEP
1 STEP
2 STEP
4 STEP
TEMPERATURE SELECTOR KNOB fig
how to use the upper electric oven
GENERAL FEATURES
USING THE OVEN FOR THE FIRST TIME
DEFROSTING FROZEN FOOD
OVEN LIGHT
TRADITIONAL CONVECTION COOKING
CONVECTION COOKING WITH VENTILATION
REGENERATION
COOKING ADVICE
STERILIZATION
ROASTING
6th, 7th, 8th STEP
1st, 2nd, 3rd STEP
4th, 5th STEP
Do not use
VERY IMPORTANT
cleaning and maintenance
GENERAL RECOMANDATION
ENAMELLED PARTS
REPLACING THE OVEN LIGHT
OVEN DOORS
DOOR ASSEMBLY
REMOVING THE OVEN DOORS
FOR YOUR SAFETY
DO’S AND DO NOT’S
INSTALLATION INSTRUCTIONS
TOOLS NEEDED FOR INSTALLATION
11.Air Supply and Ventilation
GENERAL INFORMATION
10.Electrical Requirement
12.Gas Manifold Pressure
installation
INSTALLATION TO THE CABINET
maximum
Explosion Hazard
gas connection
Install a shut-offvalve
1. Manual Shut-offValve fig
STEP
PRESSURE REGULATOR INSTALLATION STEP
Arrow
LOCK
GAS CONNECTION SPECIFICATION
3. Flexible Connections
4. Rigid Pipe Connections
CONVERSION TO LP/PROPANE GAS
5. Leak Testing
SETTING THE PRESSURE REGULATOR
INJECTORS TABLE
a oven burner
b broil burner
ADJUSTMENT OF THE OVEN BURNER MINIMUM
VERY IMPORTANT
electrical connection
Recommended ground method
Electrical Shock Hazard
Upper electric oven switch diagram
Electric diagram key
Lower gas oven light switch
Page
Page
code 1102633 ß9