DO NOT OPERATE THIS MACHINE UNTIL YOU READ AND UNDERSTAND THE ENTIRE INSTRUCTION MANUAL.

1.Carefully remove the machine from the carton. Retain all packing materials until you have inspected and satisfactorily operated the machine.

2.Place the machine on a firm, level surface with proper support of the workpiece.

3.The 36-412is shipped with the cuttinghead beveled right to 45° and locked in the down position, and the table rotated 45° left. To release the head and move it to the operating position, see “MOVING CUTTINGHEAD TO THE UP POSITION” and “MOVING THE TABLE TO THE 0° CUT-OFF POSITION” sections in this manual.

ASSEMBLY

ASSEMBLY TOOLS REQUIRED

*2mm hex wrench (supplied)

*1/2” arbor wrench (supplied)

ASSEMBLY TIME ESTIMATE - 30 minutes

D

C

A

B

Fig. 3

ATTACHING DUST BAG

1.Attach dust spout (A) Fig. 3 into port (B).

2.Depress spring clips (C) Fig. 3 of dust bag (D) and clip dust bag (D) over rib of dust spout (A).

MOVING CUTTINGHEAD TO THE UP POSITION

Push down on the handle (B) Fig. 3A, pull out cuttinghead lockpin and move the cuttinghead (B) to the up position (Fig. 4).

BA

Fig. 3A

A

Fig. 4A

B

Fig. 4

ATTACHING DUST SHROUD

DISCONNECT THE MACHINE FROM

THE POWER SOURCE.

With the cuttinghead in the up position, attach the dust shroud (A) Fig. 4A to the port (B) with three screws using the supplied wrench.

NOTE: Installation is easier if you place a screw on the wrench and then place it in the hole.

8

Page 8
Image 8
Delta 36-412 instruction manual Assembly, Attaching Dust BAG, Moving Cuttinghead to the UP Position, Attaching Dust Shroud