MOUNTING THE BOOM CENTER SECTION TO HYDRAULIC HEIGHT ADJUST

8 2

2

(DFBHAH OPTION)

 

6

 

2 2

67

9

 

 

 

 

 

 

10

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

5

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

12

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

4

 

11

 

 

 

 

 

 

 

 

17

 

 

 

 

 

 

 

 

5

 

 

 

 

 

 

 

 

 

 

 

 

53

14

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

5

 

 

 

 

3

5

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

5

3

15

 

 

 

 

 

 

 

 

 

 

 

 

5

 

 

 

 

 

 

 

3

5

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

5

3

16

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

4

 

 

 

 

 

 

 

 

 

 

 

 

 

3 2

15

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1

 

 

 

 

 

 

 

 

 

16

 

 

 

 

20

21

23

24

 

 

 

 

 

 

3

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

3

 

2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

22

25

 

 

5

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

16

 

 

 

 

 

 

 

 

 

 

 

16

15

 

 

 

CAUTION -Do not operate height

 

 

17

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

15

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

adjust until final adjustments

 

 

 

 

 

 

 

 

 

 

 

 

29

 

 

15

2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

5

 

 

 

 

 

 

have been made. Never stand on

 

3

 

 

 

 

 

 

 

 

 

 

 

 

 

 

5

 

 

 

 

 

 

 

 

 

 

28

 

 

 

16

18

 

 

 

 

or near the boom during height ad-

 

 

 

 

 

 

 

 

5

 

 

 

 

 

 

 

 

3

17

 

16

 

 

 

 

 

 

19

 

 

 

 

18

 

 

 

 

just operation.

 

15

 

 

 

 

 

 

 

 

 

 

 

13

 

 

 

 

 

5

 

14

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ASSEMBLY INSTRUCTIONS

 

 

 

 

 

 

 

 

2

 

 

 

27

 

 

 

 

 

 

 

 

20

 

 

 

 

 

 

 

 

 

 

 

1. Mount the height adjust main frame (#1) to the boom mounting

 

18

 

 

 

 

26

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

brackets (#4) on the sprayer frame with eight 3/8" x 1-14" bolts (#2),

 

 

 

 

 

 

 

 

26

 

 

 

 

 

eight 3/8" flatwashers (#3) and eight 3/8" locknuts (#5). NOTE:

 

 

11

 

 

13

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

The mounting brackets (#4) may need to be turned in or out

 

 

 

 

 

 

 

PARTS LIST

 

 

 

 

depending on sprayer frame width.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2. Mount the lock pin brackets (#20) to the boom carrier (#13), using

REF.

PART

 

 

 

 

 

 

 

 

 

 

 

four 1/2" x 1-1/4" bolts (#19) and four 1/2" locknuts (#11), make

NO.

NO.

 

QTY.

 

 

DESCRIPTION

 

 

 

 

 

sure the bolts are inserted in the right direction as shown above.

1.

 

05601

 

1

Height Adjuster Main Frame

 

 

 

 

Place the lock pin (#25) & roll pin (#24) through the bracket (#20).

2.

 

00523

 

20

3/8"-16UNC x 1-1/4" Hex Head Bolt Gr.5

 

 

Insert the spring (#23) and 7/16" flatwasher (#22) to the inside of

3.

 

00059

 

20

3/8" Flatwasher

 

 

 

 

 

the lock pin bracket and push the pin (#25) through. Secure the

 

4.

 

----

 

2

Boom Mounting Brackets (not included)

 

 

lock pin assembly with cotter pin (#21) between the washer and

 

5.

 

02592

 

30

3/8"-16UNC Nylon Insert Locknut

 

 

 

bracket. Make sure pin moves in and out freely and rotates down

 

6.

 

05605

 

2

Top Cylinder Mounting Ear

 

 

 

 

 

7.

 

05600

 

1

Hydraulic Cylinder

 

 

 

 

 

into the "latch out" position easily.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

3. Before mounting the boom carrier to the main frame assembly,

8.

 

00288

 

1

Air Vent - hydraulic cylinder

 

 

 

 

9.

 

05661

 

1

3/8" MPT x 3/8" FPT Orifice Restrictor

 

 

 

mount the UHMW wear pads (#15) to the boom carrier (#13) and

 

 

 

 

 

10.

 

05013

 

1

26' Hydraulic Hose

 

 

 

 

 

boom carrier brackets (#14) using sixteen 1/4" x 1" flathead screws

 

 

 

 

 

 

 

(#16) and sixteen 1/4" locknuts (#17).

 

 

 

 

 

 

11.

 

02178

 

5

1/2"-13UNC Nylon Insert Locknut

 

 

 

 

 

 

 

 

 

12.

 

01253

 

1

1/2"-13UNC x 2" Hex Head Bolt Gr.5

 

 

 

4. Now place the boom carrier (#13) on to the main frame assembly

 

 

 

 

 

13.

 

03306

 

1

Boom Carrier

 

 

 

 

 

(#1) so that the lock pins are in the holes of the main frame. Loosely

14.

 

03305

 

2

Boom Carrier Brackets

 

 

 

 

mount the boom carrier brackets (#14) to the boom carrier (#13)

15.

 

02946

 

8

UHMW Wear Pad

 

 

 

 

 

using eight 3/8" x 1-1/4" bolts (#2), six 3/8" x 1-1/2" bolts (#18),

 

 

 

 

 

 

 

 

 

 

 

16.

 

05732

 

16

1/4"-20UNC x 1" Slotted Flat Head

 

 

 

fourteen 3/8" flatwashers (#3) and fourteen 3/8" locknuts (#5).

 

17.

 

02772

 

16

1/4"-20UNC Hex Nylon Insert Locknut

 

 

 

5. Slide the hydraulic cylinder (#7) clevis end down through the large

 

18.

 

00914

 

6

3/8"-16UNC x 1-1/2" Hex Head Bolt Gr.5

 

 

hole in the top of the main frame assembly (#1). The hole is slotted

 

19.

 

00967

 

4

1/2"-13UNC x 1-1/4" Hex Head Bolt Gr.5

 

 

so the cylinder inlet can be maneuvered through. Slide one

20.

 

03340

 

2

Lock Pin Bracket

 

 

 

 

 

mounting ear bracket (#6) onto each peg on the cylinder, align over

21.

 

02363

 

2

5/32" x 1/14" Cotter Pin

 

 

 

 

holes in the main frame top and secure the mounting ears with four

22.

 

00205

 

2

7/16" Flatwasher

 

 

 

 

 

3/8" x 1-1/4" bolts (#2) and

four 3/8" locknuts (#5).

 

 

 

 

23.

 

02208

 

2

Lock Spring

 

 

 

 

 

6. Attach the bottom lift bracket and back-up plate (#27&28) to the

24.

 

03099

 

2

Roll Pin (3/16" x 1")

 

 

 

 

 

center of the boom carrier (#13) with four 3/8" x 2-1/4" bolts (#26)

25.

 

03342

 

2

Lock Pin

 

 

 

 

 

and four 3/8" locknuts (#5).

The hole in the lift bracket (#28) is

26.

 

02494

 

4

3/8"-16UNC x 2-1/-4" Hex Head Bolt Gr.5

 

 

offset and the hole must go towards the bottom for total adjust-

 

27.

 

05604

 

1

Bottom Lift Back Plate

 

 

 

 

 

ment. Compress the cylinder and attach the cylinder clevis to the

 

28.

 

05603

 

1

Bottom Lift Bracket

 

 

 

 

 

lift bracket with one 1/2" x 2" bolt (#12) through the 1/2" I.D. x 5/8"

 

29.

 

01839

 

1

1/2" I.D. x 5/8" lg. Spacer

 

 

 

 

 

 

Please order replacement parts by PART NO. and DESCRIPTION.

lg. bushing (#29) and one 1/2" locknut. See page 9 for adjustment.

NOTE: Use CAUTION when adjusting height. Make sure all air is bled from the line before initial trial.

Page 2

Page 4
Image 4
Demco AB20001 owner manual Mounting the Boom Center Section to Hydraulic Height Adjust, Assembly Instructions