Contents
Models BY35CEB, BY70CEB, BY100CEB, and BY150CEB
PORTABLE FORCED AIR HEATERS
SAFETY INFORMATION
PORTABLE FORCED AIR HEATERS
WARNINGS
PRODUCT IDENTIFICATION
UNPACKING
VENTILATION
ASSEMBLY
FUELS
FOR 100,000 AND 150,000 BTU/HR MODELS ONLY
Extension Cord Wire Size Requirements
THEORY OF OPERATION
OPERATION
To Start Heater
PREVENTATIVE
MAINTENANCE
STORING TRANSPORTING, OR SHIPPING
SCHEDULE
POSSIBLE CAUSE
TROUBLESHOOTING
OBSERVED FAULT
REMEDY
Upper Shell Removal
SERVICE PROCEDURES
PORTABLE FORCED AIR HEATERS
Fuel Filter
35,000 Btu/Hr Model
Continued
SERVICE PROCEDURES
70/100/150,000 Btu/Hr Models
PORTABLE FORCED AIR HEATERS
SERVICE PROCEDURES
Pump Pressure Adjustment
Continued
35,000 Btu/Hr Model
SERVICE PROCEDURES
Continued
70/100/150,000 Btu/Hr Models
PORTABLE FORCED AIR HEATERS
SERVICE PROCEDURES
Procedure if rotor is binding
Continued
SERVICE PROCEDURES
SPECIFICATIONS
WIRING DIAGRAMS
Continued
BREAKDOWN
ILLUSTRATED
PARTS
Motor and Pump Assembly
PARTS LIST
PORTABLE FORCED AIR HEATERS
Burner Head Assembly
Motor and Pump Assembly
ILLUSTRATED
PARTS LIST
M51104-01
Motor and Pump Assembly
ILLUSTRATED PARTS BREAKDOWN
Burner Head Assembly
PORTABLE FORCED AIR HEATERS
PARTS LIST
098511-138
PORTABLE FORCED AIR HEATERS
Burner Head Assembly
Motor and Pump Assembly
ILLUSTRATED PARTS BREAKDOWN
PART
PARTS LIST
PART
PART
100,000 AND 150,000 BTU/HR MODELS
ACCESSORIES
WHEELS AND HANDLES
AIR GAUGE KIT - HA1180
EC CONFORMITY DECLARATION
WARRANTY AND REPAIR SERVICE
EQUIPMENT - LIMITED 1 YEAR WARRANTY
CERTIFICATE OF GENERAL
WARRANTY SERVICE