Contents
Models BY35CEB, BY70CEB, BY100CEB, and BY150CEB
PORTABLE FORCED AIR HEATERS
WARNINGS
SAFETY INFORMATION
PORTABLE FORCED AIR HEATERS
PRODUCT IDENTIFICATION
UNPACKING
ASSEMBLY
FUELS
VENTILATION
FOR 100,000 AND 150,000 BTU/HR MODELS ONLY
THEORY OF OPERATION
OPERATION
Extension Cord Wire Size Requirements
To Start Heater
MAINTENANCE
STORING TRANSPORTING, OR SHIPPING
PREVENTATIVE
SCHEDULE
TROUBLESHOOTING
OBSERVED FAULT
POSSIBLE CAUSE
REMEDY
SERVICE PROCEDURES
PORTABLE FORCED AIR HEATERS
Upper Shell Removal
Fuel Filter
Continued
SERVICE PROCEDURES
35,000 Btu/Hr Model
70/100/150,000 Btu/Hr Models
SERVICE PROCEDURES
Pump Pressure Adjustment
PORTABLE FORCED AIR HEATERS
Continued
SERVICE PROCEDURES
Continued
35,000 Btu/Hr Model
70/100/150,000 Btu/Hr Models
SERVICE PROCEDURES
Procedure if rotor is binding
PORTABLE FORCED AIR HEATERS
Continued
SPECIFICATIONS
WIRING DIAGRAMS
SERVICE PROCEDURES
Continued
ILLUSTRATED
PARTS
BREAKDOWN
Motor and Pump Assembly
PARTS LIST
Burner Head Assembly
Motor and Pump Assembly
PORTABLE FORCED AIR HEATERS
ILLUSTRATED
PARTS LIST
M51104-01
ILLUSTRATED PARTS BREAKDOWN
Burner Head Assembly
Motor and Pump Assembly
PORTABLE FORCED AIR HEATERS
PARTS LIST
098511-138
Burner Head Assembly
Motor and Pump Assembly
PORTABLE FORCED AIR HEATERS
ILLUSTRATED PARTS BREAKDOWN
PARTS LIST
PART
PART
PART
ACCESSORIES
WHEELS AND HANDLES
100,000 AND 150,000 BTU/HR MODELS
AIR GAUGE KIT - HA1180
EC CONFORMITY DECLARATION
EQUIPMENT - LIMITED 1 YEAR WARRANTY
CERTIFICATE OF GENERAL
WARRANTY AND REPAIR SERVICE
WARRANTY SERVICE