Desa CF26PR Operating Fireplace, For Your Safety Read Before Lighting, Lighting Instructions

Models: CF26PR

1 30
Download 30 pages 33.79 Kb
Page 16
Image 16
OPERATING

FOR YOUR SAFETYLIGHTING CF26PR

VENT-FREE PROPANE/LP BAY FRONT FIREPLACE

INSTALLATION

Continued

Installing 9-Volt Battery (Not

Included) in Hand-Held Remote

Control Unit

1.Remove battery cover on back of re- mote control unit.

2.Attach terminal wires to the battery. Place battery into the battery housing.

3.Replace battery cover onto remote con- trol unit.

OPERATING

FIREPLACE

FOR YOUR SAFETY

READ BEFORE

LIGHTING

Manual background WARNING: If you do not fol- low these instructions exactly, a fire or explosion may result caus- ing property damage, personal injury or loss of life.

LIGHTING

INSTRUCTIONS

NOTICE: During initial operation of new heater, burning logs will give off a paper-burning smell. Open a window to vent smell. This will only last a few hours.

1.

STOP! Read the safety information,

 

column 2.

2.

Make sure equipment shutoff valve

 

is fully open.

3.

Set switch in OFF position.

Battery

Cover

Terminal

Wires

9-Volt Battery

Remote Control Unit

Battery

Housing

A. This appliance has a pilot which must

be lighted by hand. When lighting the

pilot, follow these instructions exactly.

B. BEFORE LIGHTING smell all

around the appliance area for gas. Be

sure to smell next to the floor because

some gas is heavier than air and will

settle on the floor.

WHAT TO DO IF YOU SMELL

GAS

• Do not try to light any appliance.

• Do not touch any electric switch; do

not use any phone in your building.

Manual background WARNING: Burner will come on automatically within one minute when the selector switch is in the ON position after the pilot is lit.

4.

Press in and turn control knob clock-

 

wise

to the OFF position.

5.

Wait five (5) minutes to clear out any

 

gas. Then smell for gas, including

 

near the floor. If you smell gas,

 

STOP! Follow “B” in the safety in-

 

formation. If you don’t smell gas, go

Figure 31 - Installing Battery in Hand- Held Remote Control Unit (CGHRC Series)

Terminal Remote

Wires Control

Unit

Battery

Manual background Cover

9-Volt Battery

Figure 32 - Installing Battery in Hand-Held Remote Control Unit (CGHRCTA Series)

• Immediately call your gas supplier

from a neighbor’s phone. Follow

the gas supplier’s instructions.

• If you cannot reach your gas sup-

plier, call the fire department.

C. Use only your hand to push in or turn

the gas control knob. Never use tools.

If the knob will not push in or turn

by hand, don’t try to repair it, call a

qualified service technician or gas

supplier. Force or attempted repair

may result in a fire or explosion.

D. Do not use this appliance if any part

has been under water. Immediately

call a qualified service technician to

inspect the appliance and to replace

any part of the control system and

any gas control which has been un-

der water.

AUTO

OFF

ON

to the next step.

 

6. Press in and turn control knob coun-

terclockwise

to the PILOT

position. Press in control knob for

five (5) seconds (see Figure 33).

Note: You may be running this

heater for the first time after hook-

ing up to gas supply. If so, the con-

trol knob may need to be pressed in

for 30 seconds or more. This will al-

low air to bleed from the gas system.

7. With control knob pressed in, press

and release ignitor button. This will

light pilot. The pilot is attached to the

front burner. If needed, keep press-

ing ignitor button until pilot lights.

Flame Adjustment Knob

IH

 

 

 

 

O

 

 

F

N

 

F

O

 

P

LO

I

TOL

 

Ignitor Button Selector Switch

Control Knob

Figure 33 - Control Knob and Ignitor Button Location (Shown as Supplied, No Control Options)

For more information, visit www.desatech.com

16

105442

Page 16
Image 16
Desa CF26PR Operating Fireplace, For Your Safety Read Before Lighting, Lighting Instructions, Installation, Continued