CGD3924NR, CGB3924NR and CGB3930NR
UVENTED NATURAL GAS LOG HEATER
INSTALLATION
Continued
Test Pressures Equal To or Less Than 1/2 PSIG
1.Close manual shutoff valve (see Fig- ure 13).
2.Pressurize supply piping system by ei- ther using compressed air or opening main gas valve located on or near gas meter.
3.Check all joints from gas meter to manual shutoff valve (see Figure 14). Apply mixture of liquid soap and wa- ter to gas joints. Bubbles forming show a leak.
4.Correct all leaks at once.
Manual | Open |
Shutoff |
|
Valve |
|
Closed
Pressure Testing Heater Gas Connections
1.Open manual shutoff valve (see Fig- ure 13).
2.Open main gas valve located on or near gas meter.
3.Make sure control knob of heater is in the OFF position.
4.Check all joints from manual shutoff valve to control valve (see Figure 14). Apply mixture of liquid soap and wa- ter to gas joints. Bubbles forming show a leak.
5.Correct all leaks at once.
6.Light heater (see Operating Heater, pages 15 through 17). Check all other internal joints for leaks.
7.Turn off heater (see To Turn Off Gas to Appliance, page 16).
9-VOLT BATTERY INSTALLATION
Two
Installing 9-Volt Alkaline Battery In Receiver
1.Locate back of receiver under front burner of heater.
2.Locate the battery clip mounted on the back of the receiver.
3.Slide a
4.Attach the teminal wires to the battery.
Receiver
Figure 13 - Manual Shutoff Valve
Manual | Thermostat Gas Valve or | |
Shutoff | ||
Control Valve Location | ||
Valve | ||
|
Gas Meter |
Figure 14 - Checking Gas Joints
Terminal
Wires
Figure 15 - Installing 9-Volt Battery In Receiver
Installing 9-Volt Battery In Hand- Held Remote Control Unit
1.Remove battery cover on back of re- mote control unit.
2.Attack terminal wires to the battery. Place battery into the battery housing.
3.Replace battery cover onto remote con- trol unit.
Battery Cover | Remote |
Control | |
Terminal | Unit |
| |
Wires |
|
| |
Battery |
|
Battery
Housing
Figure 16 - Installing Battery In Hand-
Held Remote control Unit
12 | 104306 |