INSTALLING GAS PIPING TO FIREPLACE LOCATION

WARNING: A qualified ser- vice person must connect fire- place to gas supply. Follow all local codes.

CAUTION: For propane/LP units, never connect heater di- rectly to the propane/LP supply. This heater requires an external regulator (not supplied). Install the external regulator between the heater and propane/LP supply.

Installation Items Needed

Before installing fireplace, make sure you have the items listed below.

external regulator (supplied by installer)

piping (check local codes)

sealant (resistant to propane/LP gas)

equipment shutoff valve *

test gauge connection *

sediment trap

tee joint

pipe wrench

approved flexible gas line with gas con- nector (if allowed by local codes) (not provided)

CAUTION: Use only new, black iron or steel pipe. Inter- nally-tinned copper tubing may be used in certain areas. Check your local codes. Use pipe of 1/2" diameter or greater to allow proper gas volume to fireplace. If pipe is too small, undue loss of pressure will occur.

Installation must include an equipment shutoff valve, union, and plugged 1/8" NPT tap. Locate NPT tap within reach for test gauge hook up. NPT tap must be upstream from fireplace (see Figure 34).

Propane/

LP Supply

Tank

External

Regulator

Vent

Pointing

Down

Figure 33 - External Regulator with Vent Pointing Down (Propane/LP Only)

CSA Design-Certified Equipment Shutoff Valve with 1/8" NPT Tap*

IMPORTANT: Install equipment shutoff valve in an accessible location. The equip- ment shutoff valve is for turning on or shutting off the gas to the appliance.

Check your building codes for any special requirements for locating equipment shutoff valve to fireplaces.

Apply pipe joint sealant lightly to male threads. This will prevent excess sealant from going into pipe. Excess sealant in pipe could result in clogged fireplace valves.

CAUTION: Use pipe joint seal- ant that is resistant to liquid pe- troleum (LP) gas.

We recommend that you install a sediment trap/drip leg in supply line as shown in Figure 34. Locate sediment trap/drip leg where it is within reach for cleaning. Install in piping system between fuel supply and heater. Locate sediment trap/drip leg where trapped matter is not likely to freeze. A sediment trap traps moisture and contami- nants. This keeps them from going into fireplace gas controls. If sediment trap/drip leg is not installed or is installed wrong, fireplace may not run properly.

*A CSA design-certified equipment shutoff valve with 1/8" NPT tap is an acceptable alternative to test gauge connection. Pur- chase the CSA design-certified equipment shutoff valve from your retailer.

For propane/LP connections only, the in- staller must supply an external regulator. The external regulator will reduce incoming gas pressure. You must reduce incoming gas pressure to between 11 and 14 inches of water. If you do not reduce incoming gas pressure, heater regulator damage could

Approved Flexible

Gas Line

3" Minimum

Natural - From Gas Meter (5" W.C. to 10.5" W.C. Pressure )

Propane/LP - From External Regulator (11" W.C. to 14" W.C. Pressure)

occur. Install external regulator with the vent pointing down as shown in Figure 33. Pointing the vent down protects it from freezing rain or sleet.

Cap Pipe Nipple Tee Joint

Sediment Trap/Drip Leg

Figure 34 - Gas Connection

*The CSA design-certified equipment shutoff valve may be supplied with the appliance or you can purchase it from your retailer.

18

106424

Page 18
Image 18
Desa DVF34P installation manual Installing GAS Piping to Fireplace Location, Installation Items Needed