VENTING INSTALLATION
Continued
See Detail A
2" Min.
Existing
Ceiling
Frame
Firestop
Spacer
Straps |
| |
| Straps |
|
| Detail B | See Detail B |
| Angle Firestop | |
|
| |
Straps | Straps |
|
|
| |
Detail A |
| |
Return Elbow |
| |
Figure 8 - Ceiling Support Pipe | ||
|
|
|
| Screws or | |
| Staples | |
| (Min. of 8) | |
Figure 10 - Firestop Spacer with Living | ||
| Space Above Ceiling | |
Firestop | Screws or Staples | |
(Min. of 8) | ||
Spacer | ||
| ||
| Existing | |
| Ceiling | |
| Frame |
Figure 11 - Firestop Spacer with Attic
Space Above Ceiling
Screws
B
A
Figure 9 - Elbow Offset
FIRESTOP SPACERS
Firestop spacers are required at each point where the chimney penetrates a floor space. Their purpose is to establish and maintain the required clearance between the chimney and the combustible materials. When the pipe passes through a framed opening into a living space above, the firestop must be placed onto the ceiling from below as shown in Figure 10.
They also provide complete separation from one floor space to another or attic space as required by most codes. When the double wall pipe passes through a framed opening into an attic space, the firestop must be placed into an attic floor as shown in Figure 11.
PENETRATING THE ROOF
To maintain a 1" clearance to the pipe on a roof with a pitch, a rectangular opening must be cut.
1.Determine the center point through which the pipe will penetrate the roof.
2.Determine the center point of the roof. Pitch is the distance the roof drops over a given span, usually 12". A 6/12 pitch means that the roof drops 6" for each 12" one measure horizontally down from the roof rafters.
3.Use the roof opening chart (Figure 12, page 9) to determine the correct opening length and flashing required.
4.Remove the shingles around the opening measured. Cut out this section.
5.Add the next sections of the pipe until the end penetrates the roof line. Check to see that the proper clearances are maintained. Extend chimney by adding sections of double wall pipe until pipe is minimum of 30" above the highest point of the roof cutout. Termination and chimney must extend a minimum of 36" above the highest point where it passes through the roof.