Desa S42H Venting Installation, Continued, Roof Opening Measurements, Storm Collar, Termination

Models: S42RH S42R VS42(1) VS42H(1) S42H S42

1 20
Download 20 pages 1.5 Kb
Page 9
Image 9
Figure 12 - Roof Opening Measurements

VENTING INSTALLATION

Continued

Storm Collar Installation (SC1 or SC2)

Place storm collar over pipe and slide down until

it is snug against the open edge of the flashing (see

Figure 14). Use SC1 for all round terminations and

14 3/8" Min.

(365 mm)

1" Min.

Figure 14 - Storm Collar (25 mm)

1" Min.

(25 mm)

30" Min.

(762 mm)

1" Min.

(25 mm)

SC2 for all terminations with slip sections. Apply

waterproof caulk around the perimeter of the collar

to provide a proper seal.

 

Chimney

Waterproof

Pipe

Caulk

Storm

Flashing

Collar

Opening "A"

Pitch

Slope

Opening "A"

Used Flashing

 

 

Max.

Model No.

Flat

15"

V6F-8DM

0-6/12

26.6°

16 1/8"

V6F-8DM

6/12-

45.0°

20 3/8"

V12F-8DM

12/12

 

 

 

Figure 12 - Roof Opening Measurements

FLASHING INSTALLATION (V6F-8DM OR V12F-8DM)

Determine the flashing to be used with the roof opening chart. Slide flashing over pipe until base is flat against roof. Replace as many shingles as needed to cover exposed area and flashing base. Secure in position by nailing through shingles (see Figure 13). DO NOT NAIL THROUGH FLASHING CONE.

Installing Flashing on a Metal Roof

When installing the flashing on a metal roof, it is required that putty tape be used between the flashing and the roof. The flashing must be secured to the roof

Figure 14 - Storm Collar

Terminations/Spark Arrestor The fireplace system must be terminated with the listed round top or chase terminations. In any case, refer to the installation instructions supplied with the termination. The termination approved for this fireplace are the RT-8DM and RTL-8DM that can be used for flashing or chase and ET-8DM, ETO- 8DM, ETL-8DM and ETLO-8DM for chase style termination only. Figure 15 shows an RTL-8DM round top termination.

Figure 13 - Flashing Installation CAUTION: Do not seal open- ings on the rooftop flashing. Fol- low the installation instructions provided with the termination being used.

using #8 x 3/4" screws and then sealed with roof coat- ing to prevent leakage through the screw holes.Aroof coating must also be applied around the perimeter of the flashing to provide a proper seal.

Attach Bracket Tabs to Outer Pipe (3 Places) Secure with

RTL-8D

Level of

Flue Gas

Outlet

Storm Collar

Flashing

Cone

Nail Only

Outer

Perimeter

of Flashing

Overlap

Shingles Top

and Sides Only

Screws

Overlap

Shingles Top

and Sides

Caulk

Collar

Flashing

Underlap Shingles at Bottom

Underlap

Shingles

Bottom Only

Figure 13 - Flashing Installation

Figure 15 - Termination

111099-01C

www.desatech.com

9

Page 9
Image 9
Desa S42H Venting Installation, Continued, Roof Opening Measurements, Storm Collar, Flashing Installation, Termination