12

VENTING INSTALLATION INSTRUCTIONS

Installation Planning (Cont.)

VENTING INSTALLATION

INSTRUCTIONS

Continued

HORIZONTAL SYSTEM INSTALLATION USING TWO 90°

ELBOWS

The following configurations show the minimum vertical rise requirements for a horizontal system using two 90° elbows.

Venting with Two 90° Elbows

 

 

 

Horizontal (H1) +

 

Vertical (V)

Horizontal (H1)

Horizontal (H2)

45° Elbow

5' min.

2' max.

6' max.

 

6' min.

4' max.

12' max.

 

7' min.

6' max.

18' max.

 

8' min.

8' max.

20' max.

 

20' max.

8' max.

20' max.

 

Figure 17 - Horizontal Termination Configuration for Venting Using Two 90° Elbows

Venting with Two 90° Elbows

 

Horizontal (H1) +

Vertical (V)

Horizontal (H2)

5' min.

6' max.

6' min.

12' max.

7' min.

18' max.

8' min.

20' max.

20' max.

20' max.

45° Elbow

Figure 18 - Horizontal Termination Configuration for Venting Using Two 90° Elbows with Termination at 90° with Fireplace

For..com

111986-01A

Page 12
Image 12
Desa T32P, T32N installation manual Horizontal System Installation Using TWO Elbows, Venting with Two 90 Elbows