Desa Td101, Td103, Td109, Td111 Assembly, Continued, Installing Support Pillars into Base

Models: Td101, Td103, Td109, Td111

1 52
Download 52 pages 50.76 Kb
Page 5
Image 5
Figure 3 - Installing Support Pillars into

Assembly

Continued

1.Locate table heater base and 3 lower table support pillars with holes on one side only. Making sure holes in pillars are oriented as shown in Figure 3, slide support pillars into base and attach with screws (A) and wash- ers (B) through bottom 2 holes as shown.

2.Position lower table panel and table control panel onto base assembly as shown in Figure 4. Make certain lower table panel is on side of base with wheels. Using bottom 3 sets of holes only, attach panels to support pillars with 12 screws (C) (see Figure 4). Attach ignitor ground wire with 1 screw as shown in Figure 4 (ignitor installed in step 4).

3.Top sets of screws (C) will insert through panels, through support pillars, then into pillar support connectors as shown in Figure 4 (6 screws). Make sure pillar sup- port connectors are oriented as shown in Figure 4. The side of connectors with one hole should be facing outside heater and hole should be at the top. For support con- nectors closest to front opening, second screw will only install through panels and support connectors. Second screw will secure connector (see Figure 4).

Ignitor Grounding Wire

Lower Table Panel Figure 4 - Attaching Side Panels and Ignitor

Pillar

Support

Connector

Wheel

4.Install electronic ignitor through control panel as shown in Figure 4. Screw retainer ring and ignitor cap on from outside panel. Attach ignitor ground wire to ignitor.

Support

 

Pillar

 

 

Washers

Heater

Screws

 

Base

 

Figure 3 - Installing Support Pillars into

Base

Electronic

Ignitor

Hole for

Control Valve

Table Control

Panel

Screw Installs

Through Pillar

Support and

Connector Only

Figure 4 - Attaching Side Panels and Ignitor

118992-01Fwww.desatech.com

Page 5
Image 5
Desa Td101, Td103, Td109, Td111 owner manual Assembly, Continued, Installing Support Pillars into Base