Desa (V)KC42PE installation manual Pre-Installation, Preparation, Continued, Framing and finishing

Models: (V)KC42PE

1 40
Download 40 pages 23.61 Kb
Page 7
Image 7
Pre-Installation

Pre-Installation

 

 

 

 

 

 

 

 

 

 

1

 

Preparation

 

 

 

 

 

 

 

 

 

 

2

 

Continued

 

 

 

 

 

 

 

 

 

 

3

 

Framing and finishing

A

 

 

 

 

 

 

 

Wall

 

 

 

 

 

 

 

4

 

 

 

 

 

 

 

 

 

 

 

Figure 4 shows typical framing of this fireplace.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

B

 

 

 

 

 

 

5

 

Figure 5 shows framing for corner installation. All

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

C

 

 

 

6

 

minimum clearances must be met.

 

 

 

 

 

 

 

 

 

 

 

For available accessories for this fireplace, see

 

 

 

 

 

 

D E

 

7

 

Accessories on page 35. If you are using a sepa-

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

F

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

G

 

rate combustible mantel piece, refer to Figure 6

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

for proper installation height. You can install

 

 

 

Top of Louver

 

noncombustible mantels at any height above the

 

 

 

 

 

 

Opening

 

 

 

fireplace.

 

 

 

 

 

 

 

 

 

 

 

 

 

Note: Noncombustible mantels may discolor!

 

 

 

 

Mantel from

 

 

Mantel

 

Top of Louver

40 1/8"

Ref.

Depth

Ref.

Opening

 

1

14"

A

16"

48 1/4"

2

12"

B

14"

3

10"

C

12"

 

23" Horizontal Vent

4

8"

D

10"

5

6"

E

8"

26 1/2" Vertical Vent

Figure 4 - Framing Clearances for

6

4"

F

6"

7

2"

G

4"

Installation Against an Exterior Wall

Figure 6 - Clearances for Combustible

Mantels

21B5/8" 13D 1/2" 415/8"

58C 1/2"

E

163/4"

 

 

 

 

 

48"

 

 

 

 

 

 

 

F

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

48 / "

 

 

 

 

1

4

 

 

 

 

811/2"

 

Nailing

Naili

Tabs

Figure 5 - Framing Clearances for Corner
Installation

116240-01Ewww.desatech.com

Page 7
Image 7
Desa (V)KC42PE Pre-Installation, Preparation, Continued, Framing and finishing, Clearances for Combustible Mantels