Desa (V)KC42PE installation manual Continued, Horizontal System Installation, USING TWO 90 ELBOWS

Models: (V)KC42PE

1 40
Download 40 pages 23.61 Kb
Page 14
Image 14
HORIZONTAL SYSTEM INSTALLATION
5' min. 6' min. 7' min. 8' min. 20' max.
Vertical (V)

Venting Installation instructions

Continued

HORIZONTAL SYSTEM INSTALLATION

USING TWO 90° ELBOWS

The following configurations show the minimum vertical rise requirements for a horizontal system using two 90° elbows.

45° Elbow

Venting with Two 90° Elbows

 

 

Horizontal (H1) +

Vertical (V)

Horizontal (H1)

Horizontal (H2)

5' min.

2' max.

6' max.

6' min.

4' max.

12' max.

7' min.

6' max.

18' max.

8' min.

8' max.

20' max.

20' max.

8' max.

20' max.

Figure 17 - Horizontal Termination Configuration for Venting Using Two 90° Elbows

Venting with Two 90° Elbows

Horizontal (H1) +

Horizontal (H2)

6' max.

12' max.

18' max.

20' max.45° Elbow 20' max.

Figure 18 - Horizontal Termination Configuration for Venting Using Two 90° Elbows

with Termination at 90° with Fireplace

14

www.desatech.com

116240-01E

Page 14
Image 14
Desa (V)KC42PE Continued, Horizontal System Installation, USING TWO 90 ELBOWS, with Termination at 90 with Fireplace