Desa VSGF36NTB, VSGF36PTB, VSGF36NRB Installing Logs, Installing Bottom Logs, Installing Top Logs

Models: VSGF36NRB VSGF36NTB VSGF36PRB VSGF36PTB

1 40
Download 40 pages 5.35 Kb
Page 17
Image 17
INSTALLING LOGS

Installation

Continued

4.Check all joints from equipment shutoff valve to gas control valve (see Figures 19 or 20, page 16). Apply noncorrosive leak detection fluid to all joints. Bubbles forming show a leak.

5.Correct all leaks at once.

6.Light fireplace (see Operating Fireplace, page 19. Check all other internal joints for leaks.

7.Turn off fireplace (see To Turn Off Gas to Appliance, pages 20 or 22, depending on your model).

INSTALLING LOGS

Figure 21 - Installing Bottom Logs WARNING: Failure to posi- tion the parts in accordance with these diagrams or failure to use only parts specifically approved with this heater may result in property damage or personal injury.

Figure 22 - Installing Top Logs CAUTION: Do not remove the data plates attached to the heater base assembly. The data plates contain important safety and warranty information.

It is very important to install these logs exactly as instructed. Do not modify logs. Only use logs supplied with heater.

Manual background WARNING: You must operate this fireplace with the fireplace screen in place. Make sure fire- place screen is in place before running fireplace.

Front Left Log

Rear Log

Grate

 

Bottom

Prongs

 

Log

 

Base Assembly

Front Right

 

Log

 

 

Figure 21 - Installing Bottom Logs

Middle Right Log

Middle Left Log

1.

Place bottom log in center of the base assem-

 

bly as shown in Figure 21.

2.

Rest rear log in back corner sections of base

 

assembly as shown in Figure 21. Make sure

 

log is completely vertical and not leaning in

 

toward burner where the flame will touch the

 

log.

3.

Position front right log against right side of

 

grate prongs (see Figure 21).

4.

Position front left log against left side of grate

 

prongs (see Figure 21).

5.

Place middle right log over front right and bot-

 

tom logs as shown in Figure 22. Be sure hole

 

in middle right log seats over pin in bottom

 

log.

6.

Place middle left log over front left and bot-

Pin on Front Left Log

Bottom Log

tom logs as show in Figure 22. Be sure hole

in middle left log seats over pin in front left

log.

Figure 22 - Installing Top Logs

119305-01A

www.desatech.com

17

Page 17
Image 17
Desa VSGF36NTB, VSGF36PTB, VSGF36NRB, VSGF36PRB Installing Logs, Installing Bottom Logs, Installing Top Logs