Desa (V)T32EP SERIES, (V)T32EN SERIES Continued, Snorkel Termination Installation, Elbow

Models: (V)T32EN SERIES (V)T32EP SERIES

1 40
Download 40 pages 26.37 Kb
Page 12
Image 12
CORNER AND ALTERNATE INSTALLATION

Venting Installation instructions

Continued

CORNER AND ALTERNATE INSTALLATION

Recommended Applications:

Corner ground floor installation

Ground floor installation where pipe vents horizon- tally through wall (over 12" horizontal pipe)

Basement installation where one foot clearance from ground to termination is possible

Not to Exceed (H) Limits

90° Elbow

 

Square

As Required

Termination

for (V), See

 

 

Chart for

 

Pipe Section

 

Required

Wall

 

Firestop

 

Not to Exceed

(H)Limits 90° Elbow 90° Elbow

WallSNORKEL TERMINATION INSTALLATION

Firestop

45° Elbow

Square Termination

12" Min.

45° Elbow

 

Required

 

Vertical (V)

Vertical Pipe

Horizontal (H)

*40 1/2" min.

None

30" max.

51 1/2" min.

1 ft.

48" max.

63 1/2" min.

2 ft.

60" max.

75 1/2" min.

3 ft.

84" max.

87 1/2" min.

4 ft.

20' max.

* Ground Floor Corner Venting

Figure 15 - Horizontal Termination Configuration for Corner Installation Using One

90° Elbow

SNORKEL TERMINATION INSTALLATION

Recommended Applications:

Installations requiring a vertical rise on building exterior

Any installation using snorkel termination to achieve one foot above ground

Snorkel terminations are available for installations requiring a vertical rise on the exterior of the building. If installing snorkel termination below grade, you must provide proper drainage to prevent water from entering snorkel termination (see Figure 16). Do not back fill around snorkel termination.

Snorkel

Termination

 

Snorkel Termination

Wall

 

 

Firestop

Snorkel Termination

90° Elbow

12"

Min.

12" Min.

12" Min.

45° Elbow

Manual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundAdequate

Manual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundDrainage

Figure 16 - Snorkel Termination Configurations for Below Ground Installation

12

www.desatech.com

111987-01D

Page 12
Image 12
Desa (V)T32EP SERIES Continued, Snorkel Termination Installation, Corner And Alternate Installation, Elbow