OPERATION (All models except WB5E)
After the electrical and water connections have been made, switch the power and water supply on.
The power and ready lights will flash once. The power light will then be constantly illuminated to indicate mains supply.
Providing the water supply is present, the machine will start to fill. If the machine does not fill to its
When the correct temperature has been reached, the ready light will be illuminated, wait at least 10 minutes after the ready light illuminates before starting to draw water (on first installation only). Your machine does not fill completely at once. The water input is electronically controlled to obtain maximum output, temperature and efficiency.
In daily use, switch on and wait for the ready light to illuminate. The water will then be at the correct temperature and the boiler ready to use. We recommend that you switch the power supply to the boiler off overnight and when the unit is not in use.
7