Dimplex WB5E 1, WB7, WB15, WB3 instruction manual OPERATION All models except WB5E

Models: WB7 WB5E 1 WB3 WB15

1 13
Download 13 pages 13.75 Kb
Page 7
Image 7

OPERATION (All models except WB5E)

After the electrical and water connections have been made, switch the power and water supply on.

The power and ready lights will flash once. The power light will then be constantly illuminated to indicate mains supply.

Providing the water supply is present, the machine will start to fill. If the machine does not fill to its pre-set level within 4 to 5 minutes the red service light will flash 6 times. If this happens, check that the water stop valve is turned on. If the valve is on, check that the small plastic filter in the water inlet solenoid on the machine is not clogged with debris. To clear the service light, switch the machine off and then back on again.

When the correct temperature has been reached, the ready light will be illuminated, wait at least 10 minutes after the ready light illuminates before starting to draw water (on first installation only). Your machine does not fill completely at once. The water input is electronically controlled to obtain maximum output, temperature and efficiency.

In daily use, switch on and wait for the ready light to illuminate. The water will then be at the correct temperature and the boiler ready to use. We recommend that you switch the power supply to the boiler off overnight and when the unit is not in use.

7

Page 7
Image 7
Dimplex WB5E 1, WB7, WB15, WB3 instruction manual OPERATION All models except WB5E