![Battery-Powered Systems Installation Guidelines](/images/new-backgrounds/33321/333217x1.webp)
Battery-Powered Systems Installation Guidelines
Contents
Notes and Warnings | 4 |
|
|
Installing the Batteries | 5 |
|
|
Installing Additional Battery Boxes | 6 |
|
|
Wiring the New Batteries | 6 |
|
|
Installing the Battery Fuel Gauge | 7 |
|
|
Installing the Inverter | 7 |
|
|
Optional: Installing the Inverter/Charger | 7 |
|
|
Installing the Inverter Controls | 8 |
|
|
Installing the Alternator | 9 |
|
|
Installing the Regulator | 10 – 11 |
|
|
Testing the Alternator | 12 |
|
|
Wiring the 120VAC Power to the HVAC Unit | 12 |
|
|
Optional: Installing 120VAC Outlets inside the Sleeper | 13 |
|
|
Optional: Installing Shorepower Connection | 13 |
|
|
Wiring Diagrams for Battery Connection Configurations | 14 – 19 |
|
|
ENGLISH | 3 |