Drolet DG05437/DG05447 manual Vent Terminal, Basement Installation

Models: DG05437/DG05447

1 31
Download 31 pages 38.94 Kb
Page 20
Image 20
VENT TERMINAL, BASEMENT INSTALLATION

ULTRA FLAME DV “0” Clearance Fireplace

VENT TERMINAL, STRAIGHT OUT AND CORNER INSTALLATION

Seal with RTV silicone between 8" diameter pipe and radiation shield inside and outside the building to prevent air passage. Install the vent terminal as shown. Insert the wall plate inside the 8" pipe and screw it to the wall using the six #10 2-1/2" wood screws supplied. Place the 5" locking band around the inner connector and insert the exhaust pipe. Seal the joint with RTV silicone. Secure the pipe in place with one #10 1/2" metal screw. Install the casing and secure with metal screws provided. Install the cover by inserting the tab in the slot on the wall plate and secure with metal screws.

Seal around the terminal to prevent any water from leaking into the house. Seal both ends of the slot where the cover was inserted in wall plate with RTV silicone.

VENT TERMINAL, BASEMENT INSTALLATION

Seal with RTV silicone between 8" diameter pipe and radiation shield inside and outside the building to prevent air infiltration.

Attach the 4" flexible pipe with the locking band and with RTV silicone.

Attach the wall plate with 4 wood screws # 10 x 2-1/2" (supplied).

Seal around the terminal to prevent water leakage into the house.

20

Page 20
Image 20
Drolet DG05437/DG05447 manual Vent Terminal, Basement Installation