Drolet DG05437/DG05447 manual Vent Terminal, Roof Installation, Optional Blower Installation

Models: DG05437/DG05447

1 31
Download 31 pages 38.94 Kb
Page 21
Image 21
VENT TERMINAL, ROOF INSTALLATION

ULTRA FLAME DV “0” Clearance Fireplace

VENT TERMINAL, ROOF INSTALLATION

Roof vents are required to extend at least 3 ft. above the highest point where they pass through the roof of the building and at least 2 ft. higher than any portion within 10 feet.

Clearance between combustible wall and vent pipe must be 2" and a radiation shield must be used through the insulated wall.

If the vent terminal is more than 5 feet above the roof, use roof braces to secure the whole assembly.

OPTIONAL BLOWER INSTALLATION

See the instruction sheet included with the optional blower before proceeding with its installation.

21

Page 21
Image 21
Drolet DG05437/DG05447 manual Vent Terminal, Roof Installation, Optional Blower Installation