S e t - u p & D e l i v e r y G u i d e l i n e s

Getting Ready For Delivery & Set-up Of Your New Spa

Surface And Pad Requirements

Your new portable spa must be placed on a uniformly firm, flat, and level surface. A concrete pad 4 inches thick is best.

If your spa is located near sprinklers, adjust or cap them so as not to hit the siding of the spa.

Balconies And Deck Requirements

Decking must be constructed to support 85 pounds per square foot.

Balconies must be constructed to meet current state and local codes.

Gates must be self closing and self-latching.

Access & Clearance

Your spa requires up to 40" of clearance through gates between house and side fences, and up to 8.5' overhead clearance depending on the size of the unit.

The clearance required to turn a corner can be equal to the length of the spa.

All debris blocking access to the job site, must be removed prior

to delivery. Any trimming of trees or bushes, removal of debris, leveling of ground or other general maintenance must be done prior to delivery and is the responsibility of the customer.

Electrical Requirements

Your 110 Volt spa pack requires an isolated (no other appliances or lights on this circuit at any time) 110 Volt, 20 amp circuit breaker cords maximum length 15 ft.

Your 220 Volt spa pack will require a 50 amp dedicated GFCI circuit breaker, depending on model.

Wiring Requirements

4 Wire #8 Gauge wire under 50 ft.

2-Hots, 1-Neutral, 1-Isolated Ground

4 Wire #6 Gauge wire over 50 ft.

2-Hots, 1-Neutral, 1-Isolated Ground

8

Page 8
Image 8
Dynasty Spas Deluxe System D-1000, Premier System D-2000, Elite System D-3000 T u p & D e l i v e r y G u i d e l i n e s