1/4-20 WELD NUT
Figure 5.5.9b Retainer Bolt Installation
CABLE CHANNELS
Figure 5.5.9c Cable Routing
1.Install at least one of the supplied
2.Route cabling as required using the rear channels in the enclosures extrusion.
3.Rotate the enclosure to the desired horizontal angle. Firmly tighten each Enclosure Bracket Bolt to secure the enclosure in the desired position.
ENCLOSURE BRACKET BOLT
Figure 5.5.9d Secure the Enclosure Position
28