18Installation
CONNECTING THE DUCTWORK
LOWER
FLUE
RETAINING
SCREWS
8” ROUND |
|
METAL | Figure 14 |
DUCT |
MOUNTING SCREWWS (3.9 x 9.5 mm)
Figure 15
1Use 8” round metal duct to connect the discharge collar on the hood to the ductwork above.
2Use duct tape to make all joints secure and air tight.
3Remove the two temporary retaining screws from the lower flue and set it in place on the hood.
4Secure decorative flue to hood with two mounting screws (3.9 x 9.5mm). pan head mounting screws.
REPLACING THE BOTTOM TRIM
1Remove the four (4) screws from the inside of the hood.
2 Remove the trim by pulling downward.
3 Slide the new trim upward into hood.
4 Replace the four screws inside hood.
Figure 16