23:1
FOM 71MP-Lab Regular maintenance 6-12 monthsThe reference machine shall at a regular basis be maintained and checked
in order to ensure that the reference machine is in good order and will
work in accordance with the specifications given in IEC 60456.
Every 6 months:
• Usethestartupprogram(Program3)andmakeavisualcheckand
ensure that the supply or drain valves are not leaking.
• CarryoutaowmetercheckaccordingtoinstructionsinChapter18.
• Topreventthebuildupofscaleifthereferencemachineisruninhard
water decalcify the machine according to procedure described in
chapter 21.
• Checkforanybuildupoflintordetergentandifveriedcleanaccor-
ding to instructions in Chapter 21
• CarryoutanemptyruntestCotton60ºCorCotton40ºCdepending
what type of program to run during the test period.
• ComparetheresultsobtainedwithresultsshowninTable1inChap-
ter 11 "Empty run test data". Note the definitions assigned to the time
intervals shown in the table.
• IfvaluesareoutsidethespecicationinTableE.2inIEC60456make
another empty run test or recalibrate.
• Ifothervaluesfromtheemptyruntestdiffersfromthevaluesshownin
Table 1, analyse the reason for this difference and correct (wrong water
pressure, wrong supply water temperature, faulty heating element etc).
• Topreventthebuild-upofscaleifthereferencemachineisrunin
hard water decalcify the machine according to procedure described in
chapter 21.
• Checkforanybuild-upoflintordetergentand,ifveried,cleaninac-
cordance with procedures set out in Chapter 21.
• CarryoutanemptyruntestCotton60ºCorCotton40ºCdepending
what type of program to run during the test period.
• ComparetheresultsobtainedwithresultsshowninTable1inChap-
ter 24 "Empty run test data". Note the definitions assigned to the time
intervals shown in the table.
• IfvaluesareoutsidethespecicationinTableE.2inIEC60456make
another empty run test or recalibrate.
• Ifothervaluesfromtheemptyruntestdiffersfromthevaluesshownin
Table 1, analyse the reason for this difference and correct (wrong water
pressure, wrong supply water temperature, faulty heating element etc).
Once a year:
• Performacompletecalibrationofthemachineinaccordancewithcer-
tified procedures.
Regular maintenance 6 -12 months