1.Refer to Micro Motion’s 9-Wire Flowmeter Cable Preparation and Installation Guide for instructions on cable shielding and preparation:

At the sensor end, follow the instructions for your cable type.

At the core processor end, follow the instructions for your cable type with an MVD transmitter.

2.To connect the wires, refer to Micro Motion’s 9-Wire Flowmeter Cable Preparation and Installation Guide and follow the instructions for your sensor with an MVD transmitter. Additional information for connecting the wires at the core processor is provided below:

a. Identify the components shown in Figure 10.

a.Remove the core processor’s end-cap.

b.Insert the 9-wire cable through the conduit opening.

c.Connect the wires to the plugs supplied with the core processor.

d.Insert the plugs into the sockets inside the lower conduit ring. See Figure 15.

Figure 15. 9-wire cable to core processor

9-wire cable from

Core processor

 

sensor

 

 

Black

Ground screw

 

Black

 

(Drains from

 

 

 

all wire sets)

Brown

 

Brown

Violet

Red

Yellow

Green

Red

 

White

Green

 

 

 

White

 

 

Blue

Plug and

 

Gray

socket

 

Orange

 

Blue

Violet

 

Gray

Yellow

Mounting screw

Orange

 

 

3.Ground the cable. If using jacketed cable:

a.Ground the shield drain wires (the black wire) only on the core processor end, by connecting it to the ground screw inside the lower conduit ring. Do not ground to the core processor’s mounting screw. Do not ground the cable at the sensor junction box.

18

Page 19
Image 19
Emerson 3350, 3700 installation instructions Wire cable to core processor