INSTALLATION (continued)
observe these lights
press this button
Figure 1–6. Standard controls and indicators.
3 – Electrical Operation
This procedure will check the electrical opertion of the Automatic Transfer Switch.
Close the enclosure door first !
Transfer Test
Both normal and emergency sources must be available and the emergency source generator (if used) must be capable of being started in this procedure.
Perform steps 1 through 8 at the right. Observe the status lights. See Figure
OBlack circle means light is on. P White circle means light is off.
NOTE: If Motor Load Transfer feature is activated, then transfer may not occur immediately after the respective time delays. Transfer will only occur when the phase relationship between sources is correct.
This completes the Functional Test of the ASCO Series 300 Automatic Transfer Switch. Leave the
| The normal source must be |
|
| available and the generator | Source Accepted |
1 must be ready to start. | Normal | |
| Check that the Normal Source | |
| Emergency | |
| Accepted light is on. | |
|
| |
| Press and hold the Transfer Test |
|
2 | button until the engine starts | Transfer |
and runs. This should happen | Test | |
| within 15 sec. |
|
| The Emergency Source | Source Accepted |
3 |
| |
| Accepted light should come on. | Normal |
|
| Emergency |
| The transfer switch should |
|
| transfer to the Emergency | Transfer Switch |
4 | position. The Emergency | Position |
Transfer Switch Position light | Normal | |
| should come on and the Normal | Emergency |
| light should go off. |
|
| If the transfer to emergency |
|
| delay is used the transfer |
|
5 | should occurs after a time delay | Bypass |
(up to 5 minutes). | Time Delay | |
| For immediate transfer press |
|
| the Bypass Time Delay button. |
|
| The transfer switch should |
|
| transfer back to the Normal | Transfer Switch |
6 | position. The Normal Transfer | Position |
Switch Position light should | Normal | |
| come on and the Emergency | Emergency |
| light should go off. |
|
| If the retransfer to normal delay |
|
| is used the retransfer should |
|
7 | occur after a time delay | Bypass |
(up to 30 minutes). | Time Delay | |
| For immediate retransfer press |
|
| the Bypass Time Delay button. |
|
| The unloaded running delay |
|
| keeps the generator running for | Source Accepted |
8 | 5 minutes | Normal |
Then the generator should stop | ||
| and the Emergency Source | Emergency |
|
| |
| Accepted light should go off. |
|