TESTING & SERVICE (continued)
TROUBLE-SHOOTING
Note any optional accessories that may be furnished on the 7ADTB and review their operation. Refer to any separate drawings and/or instructions that may be packed with the 7ADTB. See Table B.
Hazardous voltage capable of causing shock,
burns, or death is used in this switch. Do not touch the power or load terminals of the bypass switch or transfer switch!
Table B.
PROBLEM | CHECK IN NUMERICAL SEQUENCE | |||
1 OPERATION | 2 | 3 VOLTAGE | ||
| ||||
Hold Transfer Test switch 15 | Starting control must be in the |
| ||
not start when the Transfer | seconds or the outage must | automatic position. Batteries |
| |
Control switch is turned and | be long enough to allow for | must be charged and | ||
held in Transfer Test position | Feature 1C time delay plus | connected. Check wiring to |
| |
or when normal source fails. | engine cranking and starting. | engine starting contacts. |
| |
|
|
|
| |
Transfer switch does not | Wait for Feature 2B time delay | Generator output circuit | Voltmeter should read at least | |
transfer the load to the | to time out. | breaker must be closed. | 90% of nominal phase to | |
emergency source after the |
| Generator frequency must be | phase voltage between | |
| at least 95% of nominal (57 Hz | terminals EA and EC (or EL1 | ||
|
| for a 60 Hz system.) * | and EL2 for 2 pole switches)* | |
|
|
|
| |
Transfer switch does not | Wait for Feature 3A time delay |
| Voltmeter should read at least | |
transfer the load to normal | to time out. |
| 90% of nominal phase to | |
source when normal returns |
| phase voltage between | ||
or when the Transfer Control |
| terminals NB and NC, NC and | ||
|
| |||
switch is released. |
|
| NA, and NA and NB (or NL1 | |
|
|
| and NL2 for 2 pole switches). | |
|
|
|
| |
Gen. does not stop after load | Wait for Feature 2E time delay | Starting control must be in the | ||
retransfer to normal source. | to time out. | automatic position. | ||
| ||||
|
|
|
| |
Load Disconnect Active light | Wait for load disconnect time | Explanation: Transfer switch in | delayed transition transfer mode. | |
comes on. | delay to time out. | Load disconnect time delay is adjustable from 0 to 5 min. 59 sec. | ||
|
|
| ||
Load Disconnect Active light | Check load disconnect time | Explanation: Transfer switch contacts are open longer than 5 | ||
stays on longer than 6 min. | delay setting. Call ASI. | min. 59 sec (maximum setting). Load remains disconnected. | ||
|
|
|
|
* These are factory settings. Refer to Controller’s User’s Guide.
If the problem is isolated to circuits on the controller or the transfer switch, call your local ASCO Power Technologies sales office or ASI: in the United States, call
MAINTENANCE HANDLE
Bypass and isolate the Transfer Switch before using the maintenance handle! See pages
1.Bypass, isolate, and withdraw the transfer switch (pages
2.Move the maintenance handle up or down as shown to manually operate the transfer switch. Operate
both upper and lower contact shafts. Observe the window indicators (right side). Remove the mainte- nance handle and store it on the lower left side.
Emergency contacts
(upper shaft)
windowcontact
indicatorsposition indicators
O is open(right side) C is closed
Normal contacts
(lower shaft)
Figure