INSTALLATION (continued)

INSTALLATION (continued)

GREEN RED

observe these lights

GREEN RED AMBER

Figure 1-2. Standard controls and indicators.

Functional Test

Read all instructions on the Wiring Diagrams and labels affixed to the 7ADTB. Note the control features that are provided and review their operation before proceeding.

After installing the 7ADTB check the following:

Bypass Handle should be in the NORMAL position.

Isolation Handle should be in the CONN position.

CN transfer switch should be C (closed)

CE transfer switch should be O (open)

If handles are not in correct positions, follow instructions for Bypassing and Isolating the automatic transfer switch in Section 3. Do not force the handles. Electrical interlocks prevent a wrong sequence of operation.

1 – Voltage Checks

First check nameplate on transfer switch; rated voltage must be the same as normal and emergency line voltages.

Use extreme caution when using a meter to measure voltages. Do not touch power terminals; shock, burns, or death could result !

Perform steps 1–6 at the right. Observe the status lights. See Figure 1–2.

Black square means light is on.

White square means light is off.

*If necessary, adjust voltage regulator on generator per the manufacturer’s recommendations. The 7ADTB will respond only to rated voltage specified on the nameplate.

Now continue to 2 – Electrical Operation on next page.

Close the normal source circuit breaker. The Transfer Switch

1Connected To Normal and the

 

Normal Source Accepted lights

Active

 

 

Load

 

 

Disconnect

 

should come on.

 

 

Use an accurate voltmeter to

 

 

check phase to phase and

 

2 phase to neutral voltages pres-

 

 

ent at the transfer switch normal

 

 

source terminals.

 

 

Close the emergency source

 

 

circuit breaker. (Start generator,

 

3

if necessary.) The Transfer

 

Switch Connected To Normal &

Load

 

Emergency Source Accepted

Disconnect

 

Active

 

lights should come on.

 

 

Use an accurate voltmeter to

 

 

check phase to phase and

 

4 phase to neutral voltages pres-

 

 

ent at the transfer switch emer-

 

 

gency source terminals.*

 

 

Use a phase rotation meter to

A B C

 

 

5

check phase rotation of emer-

 

gency source; it must be the

 

 

same as the normal source.

 

 

Shut down the engine–genera-

 

 

tor, if applicable. The Emergen-

 

 

cy Source Accepted light should

 

6 go off. Then put the starting

 

 

control selector switch (on the

Active

 

 

Load

 

 

Disconnect

 

generator set) in the automatic

 

 

position. Close enclosure door.

 