Extron electronic PVS 305SA manual Installation - Stage Four, cont’d, the MLC power/RS-232 cable

Models: PVS 305SA

1 46
Download 46 pages 10.52 Kb
Page 32
Image 32
Installation — Stage Four, cont’d

Installation — Stage Four, cont’d

2.Pull the cables (at the switcher location)

a.Gather all the cables from the speakers, A/V wall plates, MLC 104 IP Plus controller, and any installed optional devices that have been run to the switcher location, and pull them down through the ceiling hole and the pipe. These cables are:

the MLC power/RS-232 cable

the CAT 5 input cables from the wall plates

the speaker cables

the MLC to projector (IR/RS-232 projector control) cable

any optional device cables (e.g. Aux audio input Priority Page Sensor Kit, VoiceLift etc.)

b.Pull the cables out of the pipe slot towards the switcher, ready for connection. Leave the IR/RS-232 projector control cable to hang out of the bottom of the pipe.

c.Connect the output video signal cables (VGA and RCA) to the switcher and pull the loose ends down the pipe so that they hang out the pipe with the IR/RS-232 projector control cable. These cables connect to the projector later.

NDo not thread any high voltage power cabling, such as power supply or projector power cords, through the projector pipe. This violates National Electrical Code.

2b Gather the cables, pass them down the pipe.
Cables from A/V wall plates, MLC 104 IP Plus, and FF 120 speakers.Optional accessory cables from the VoiceLift andPage Sensor may also be included.

1

1

1

4

2

3

3

Cables to PVS 305SA

1 A/V wall plate cables, CAT 5

2 MLC 104 IP Plus switcher control cable

3 FF 120 speaker cables

1

1

Power

Supply

 

6

3

5

 

2

 

PoleVault

Switcher

Projector

Pole

Cable Access

Slot

 

Cables to Projector

4 5 6

4

IR/RS-232 projector control cable

To Projector

5

VGA cable

 

 

6

Video RCA cable

NNot all cables that may need to be installed are shown here.
Switcher and projector cable overview
2-21 PoleVault Systems Installation • Installation — Stage 4
Page 32
Image 32
Extron electronic PVS 305SA Installation - Stage Four, cont’d, Pull the cables at the switcher location, To Projector