Extron electronic PVS 305SA manual Installation - Stage Three, cont’d, Cut ceiling tile

Models: PVS 305SA

1 46
Download 46 pages 10.52 Kb
Page 28
Image 28
Installation — Stage Three, cont’d

Installation — Stage Three, cont’d

NThe installation must conform to national and local electrical codes, and UL requirements. Refer to the device’s user manual for details.

1.Cut ceiling tile

If installing FF 120 speakers, do the following:

a.Remove the ceiling tiles where the speakers are to be installed.

TFor ease of working on the speaker when it is replaced on the T-frame, remove an adjacent tile(s).

b.Mark a line 12 inches from one of the short sides of the tile and cut along the line. Discard the short portion.

TUse a fine hacksaw blade to cut the tile without damaging the face and place an empty box under the

tile for support and to collect the waste.

1b Mark and cut the tile

2.Install the speaker on the drop ceiling

a.At the speaker location, lay one of the supplied T-rails 12 inches from one end of the T-frame. The speaker will be placed into the small section.

b.Remove the terminal cover from the rear of a speaker and attach the anchor ring and cable clamp to the cover.

c.Place the speaker onto the T-frame and, passing the speaker cable through the cable clamp, connect the speaker wires to the speaker terminals:

Red wire - positive (+)

Black wire - negative (-)

d.Reattach the terminal cover.

e.If possible, bend the seismic tabs over the T-rails.

f.Replace the ceiling tile.

Repeat the steps 1 and 2 for each speaker that needs to be installed, connecting the speakers according to the system preferred (e.g., in parallel, see page 2-18).

If you wish to install an optional seismic/safety cable, at each speaker location do the following:

g.Mark, drill and install a lag eye bolt for the seismic/ safety cables (not included) in the structural ceiling above the speaker location.

h.Pass the seismic cable through the anchor ring down to the seismic tab and twist the end around the cable 5 times. Pass the other end up through the lag eye bolt and twist that end around the cable 5 times.

2a Place the T-rails on the T-frame

2b Remove terminal cover and attach clamp and ring.

Anchor this end to a lag eye bolt screwed into the structural ceiling.

Route the safety cable through the anchor ring 1.Cut ceiling tileand the seismic tab.

Seismic Safety

Cable

2h Attach safety cable
2-17 PoleVault Systems Installation • Installation — Stage 3
Page 28
Image 28
Extron electronic PVS 305SA Installation - Stage Three, cont’d, Cut ceiling tile, Install the speaker on the drop ceiling