Emerson CF3900AW01, CF3900WPB01, CF3900WW01, CF3900AB01, CF3900BQ01, CF3900BS01 Assembly Instructions

Models: CF3900PB01 CF3900CK01 CF3900HTW01 CF3900OB01 CF3900TG01 CF3900AW01 CF3900BS01 CF3900BQ01 CF3900AB01 CF3900WW01 CF3900WPB01

1 12
Download 12 pages 23.91 Kb
Page 5
Image 5
Assembly Instructions

Assembly Instructions

1.

Remove the fan motor and housing assembly from

 

styrofoam packaging and position it so that the top

 

of the motor is facing you.

2.

Separate, untwist and unkink the three motor

 

leads. Route the motor leads through the hanger

 

ball/downrod assembly and seat the downrod in the

5.Remove the hanger ball by loosening the setscrew in the hanger ball until the ball falls freely down the downrod. Remove the pin from the downrod, then remove the hanger ball. Retain the pin and hanger ball for reinstallation in step 8.

motor coupling.

3. Align the clevis pin holes in the downrod with the

holes in the motor coupling. Install the clevis pin

and secure with the hairpin clip. The clevis pin

must go through the holes in the motor coupling

and the holes in the downrod. Push the straight leg

HANGER BALL

DOWNROD

PIN

SETSCREW

of the hairpin clip through the hole near the end of

the clevis pin until the curved portion of the hairpin

clip snaps around the clevis pin. The hairpin clip

must be properly installed to prevent the clevis pin

from working loose. Pull on the hanger ball to make

sure the clevis pin is properly installed.

!WARNING

It is critical that the clevis pin in the motor coupling is properly installed and the setscrew securely tight- ened. Failure to verify that the pin and setscrew are properly installed could result in the fan falling.

HANGER BALL

 

 

DOWNROD

 

HAIRPIN

SETSCREW

CLIP

 

CLEVIS PIN

MOTOR

 

COUPLING

Manual background HANGER BALL/

DOWNROD

HAIRPINASSEMBLY

CLIP

CLEVIS

CLEVIS

PIN

PIN

MOTOR COUPLING

 

4.Install the setscrew (supplied in loose parts bag) in the motor coupling. While pulling up on the hanger ball, tighten the setscrew using the 5/32" setscrew wrench (supplied).

NOTE: The setscrew must be properly installed as described above, or fan wobble could result.

SETSCREW

DOWNRODWRENCH

6.Screw two 1” threaded studs (provided) into the motor. Leave approximately 7/8” of the stud extend- ing above motor. Slide the motor cover over the downrod and rotate the cover until the threaded studs protrude; install two knurled knobs (supplied) to secure the cover.

NOTE: Make sure the red and brown leads are capped with wire connectors and are completely inside motor cover and not pinched between the motor cover and motor.

 

KNURLED

 

KNOB

 

MOTOR

 

COVER

WIRE

 

CONNECTORS

 

 

1" THREADED

RED LEAD

STUD

MOTOR

BROWN LEAD

7/8"

 

7.Position the ceiling cover over the downrod. Be sure the cover is oriented correctly, with the large open- ing at the top.

8.Reinstall the hanger ball on the downrod as follows. Route the motor leads through the hanger ball and slide the hanger ball over the downrod. Install the pin through the holes at the top of the downrod and slide the hanger ball up the downrod, aligning the ball so the pin is captured in the groove in the top of the hanger ball. Pull the hanger ball up tight against the pin and securely tighten the setscrew in the hanger ball. A loose setscrew could create fan wobble.

!WARNING

It is critical that the pin in the hanger ball is properly installed and the setscrew securely tightened. Failure to verify that the pin and setscrew are properly installed could result in the fan falling.

Manual background PIN

HANGER BALL

DOWNROD Manual background

SETSCREW

CEILING COVER Manual background

5

Page 5
Image 5
Emerson CF3900AW01, CF3900WPB01, CF3900WW01, CF3900AB01, CF3900BQ01, CF3900BS01, CF3900TG01, CF3900OB01 Assembly Instructions