START-UP AND TROUBLESHOOTING TEST PROCEDURE
The Test Unit Performance Data sheet below is provided for use by a qualified service professional. In order for our Techni- cal Service Department to better serve you, please complete and have this information
ready when calling. Make sure to include the Model Number, Serial Number, Date of Installation.
Call our Technical Support Department
@
Test Unit Performance Data
Model Number
Serial Number
Indoor Section
Evaporator Entering Air - DB
Evaporator Entering Air - WB
Evaporator Leaving Air - DB
Evaporator Leaving Air - WB
Outdoor Section
Entering Air
Leaving Air
Temperature Split
Operating Pressures
Compressor Suction - PSIG
Compressor Discharge - PSIG
Power Input
Compressor - Volts
Compressor - Amps
OD Fan Motor - Volts
OD Fan Motor - Amps
ID Fan Motor - Volts
ID Fan Motor - Amps
Total Volts
Total Amps
Temperatures - Degrees F°
Compressor Suction
Compressor Discharge
Liquid Out Cond.
Liquid before Expansion
Suction out Evaporator
Capacity Calculations
DB - Temp Split at evap.
Date:
Technician:
Mode: Cooling
Notes
Note: Rotary compressors are critically charged sys- tems, do not over charge. Refer to the Charge Table specific to the unit being installed or call the factory.
Test Summary
Compressor Superheat
Sub Cooling
Save this information for future servicing. In the event there is a problem with the unit. Perform the test again (if possible) and have both sets of data ready when calling for assistance.
15 | www.enviromaster.com |