FRAMING AND FINISHING (continued)

Figure 39

Figure 41

See Horizontal Termination Page 24 and Vertical Termination

 

 

Page 25-26.

Figure 40

HORIZONTAL TERMINATION

NOTE: Termination cap should pass through the wall firestop from the exterior of the building. Adjust the termination cap to its final exterior position on the building.

WARNING: Termination cap must be positioned so that arrow is pointing up.

Attach the termination cap with the four wood screws provided. Before attachment of the termination, run a bead of silicone sealant rated above 250°F on its outside edge too, so as to make a seal to the exterior wall.

NOTE: Wood screws can and should be replaced with appropriate fasteners for use on stucco, brick, concrete or other types of siding.

CAUTION: If exterior walls are finished with vinyl siding, (or materials that could become discolored or warp) it is necessary to install the vinyl siding standoff SD-1250.

Vinyl siding standoff SD-1250 will be installed between the vent

 

termination and the exterior wall. (See Figure 42) This horizontal

 

vent termination bolts onto the flat portion of the vinyl siding

 

standoff, so an air space will exist between the wall and the

 

termination cap.

Figure 42

 

Page 24

17375-6-0705

Page 24
Image 24