Empire Comfort Systems GN, PV-28SV50-BN, PV-28SV55-CN, GP)-1, CP PVVK-24HAND PVVK-48HVENT KIT, Step

Models: BP)-1 GN PV-28SV50-BN CP GP)-1 PV-28SV55-CN

1 56
Download 56 pages 57.58 Kb
Page 32
Image 32
PVVK-24H AND PVVK-48H VENT KIT

PVVK-24H AND PVVK-48H VENT KIT

Available from Empire Comfort Systems, Inc.

Step 1. Install foam gasket on back side of co-axial direct vent adaptor.

Step 4.

Install silicone around connection between co-ax- ial adaptor and co-axial air-inlet duct.

Step 2. Attach co-axial direct vent adaptor and gasket (4 screws) to the rear of fireplace.

4 1/2”

MINIMUM VENT LENGTH

3 13/16”

Step 4. MINIMUM TUBE LENGTH

Step 5. Slide co-axial vent pipes into co-axial adaptor. Cut the PVC co-axial pipes at this time. Minimum horizontal vent length 4 1/2” (11.4 cm) Minimum tube length 3 13/16” (9.7 cm)

Step 3. Attach co-axial air-inlet duct to rear of fireplace (6 screws).

Step 6. Direct vent co-axial venting is completed.

Page 32

22618-17-0308

Page 32
Image 32
Empire Comfort Systems GN, PV-28SV50-BN, PV-28SV55-CN, GP)-1, BP)-1, CP PVVK-24HAND PVVK-48HVENT KIT, Step