England's Stove Works 55-TRPEPI, 55-SHPEPI operation manual Freestanding Installation

Models: 55-TRPEPI 55-SHPEPI

1 62
Download 62 pages 27.68 Kb
Page 14
Image 14

FREESTANDING INSTALLATION

Mobile Home Installation

As with all installations involving this unit, the use of outside combustion air is mandatory and MUST be used. Please see the “Outside Air” section on page 15 for more information regarding outside air connections.

The pellet stove MUST be secured to the floor of the mobile home using lag bolts and the holes provided in the bottom of the pedestal for this purpose.

The pellet stove MUST be grounded with #8 solid copper grounding wire (or equivalent), terminated at each end with an NEC approved grounded device.

Carefully follow all clearances listed in the appropriate section of this manual AND follow the venting manufacturer’s minimum clearance requirements. Similarly, be certain the venting system used is approved for mobile home use.

Installation must be in accordance with Manufacturers Home & Safety Standard (HUD) CFR 3280, Part 24 as well as any applicable local codes.

WARNING

DO NOT INSTALL IN A SLEEPING ROOM.

CAUTION

THE STRUCTURAL INTEGRITY OF THE MANUFACTURED HOME FLOOR, WALL AND CEILING/ROOF MUST BE MAINTAINED.

Caution

NEVER draw outside combustion air from:

Wall, floor or ceiling cavity.

Enclosed space such as an attic, garage or crawl space.

For high altitude installations (above 4,000 ft.), the vent pipe should be

increased from 3-inch (3”) to four-inch (4”).

Page 14

Page 14
Image 14
England's Stove Works 55-TRPEPI, 55-SHPEPI operation manual Freestanding Installation