Powering Up

Powering Up

Simply plug one end of the power cord or power supply into the unit, and the other end into a grounded AC power source. Units are typically connected to a power strip or other power outlet that may be cycled on and off. An uninterruptible power supply (UPS) may be used.

Figure 2-1 BL-69551ENT Schematic Block Diagram

 

RJ45

Data

 

1

 

2

 

 

In

 

3

 

4

 

 

6

 

 

5

 

 

7

 

 

8

 

 

 

PoE

Power &

Control

RJ45

1

2Data &

3

 

Power

6

 

 

 

54

+

Out

7

-

 

8

 

 

ON (green)

FAULT (red)

CONNECT (green)

Description of LED Functions

Power-up Sequence

Upon power‐up, all 3 LEDs will light for 2 seconds, as part of the self‐test for the internal microprocessor software. After the end of the 2 seconds, the “ON” LED will illuminate green, signifying that the DC output voltage is available for powering a compliant load (to the 802.3af PoE standards).

Single-Port Power Over Ethernet Adapter User’s Guide 2-3

Page 25
Image 25
Enterasys Networks BL-69108ENT, BL-69551ENT manual Out, Powering Up