Enterasys Networks C2RPS-POE manual Guidelines for Installation

Models: C2RPS-POE

1 34
Download 34 pages 10.03 Kb
Page 24
Image 24

Installing the C2RPS-POE on a Flat Surface

Guidelines for Installation

Locate the C2RPS‐POE within 152 cm (5 ft) of its power source and on a surface as shown in Figure 2‐2.

Caution: To ensure proper ventilation and prevent overheating, leave a minimum clearance space of 5.1 cm (2.0 in.) at the left, right, and rear of the switch.

Do not connect the switch to the AC power source until instructed to do so later in the installation process

Precaución: Para asegurar una buena ventilación y evitar que el sistema se sobrecaliente, deje un espacio mínimo de 5.1 cm (2 pulgadas) con respecto a los lados y a la parte posterior del aparato..

No conecte la fuente del poder a la fuente primaria hasta que no se le indique.

If the switch is being installed as a standalone switch, proceed to Connecting

C2RPS‐POE Cable and AC Power Cord” on page 2‐7 for power connection instructions.

Figure 2-2 Area Guidelines for C2RPS-POE Installation on Flat Surface

À

 

 

 

C2RPS-POE

Á

 

 

 

 

 

Ã

 

 

 

 

 

 

Â

 

1

Approximately 152 cm (5 ft) from power source

3

49.5 cm (19.5 in.) for proper ventilation

2

4.45 cm (1.75 in.) per C2RPS-POE (Vertical

4

21.5 cm (8.5 in.) for proper ventilation

 

clearance depends on number of devices

 

 

 

 

stacked.)

 

 

 

2-4 Installation

Page 24
Image 24
Enterasys Networks C2RPS-POE manual Guidelines for Installation